Who we are
D&D is a hosting company offering servers housing, cloud solutions, applications, websites and email hosting. It was founded in 2007. We own 100% of the hardware and infrastructure we use, and we are fully located in Switzerland. Our whole team is also located in Switzerland.
Datacenter
Status of datacenter
| Datacenter location |
1023 Crissier VD (Suisse) |
| Owner |
BrainServe SA |
| Motorway access |
Distance approx. 1’300 m |
| Parking |
Nearby and within the site |
| Public transports |
Bus stop approx. 100m |
Characteristics of the building
| Static load |
1’000 kg/m2 in server rooms |
| Height |
260-270 cm in server rooms (excluding raised floor) |
| Raised floor height |
60-70 cm in server rooms |
| Surface of server rooms |
2000 m2 |
Physical security: access, fire
| Perimeter |
Plots fenced (height min.3.5m), patrols |
| Bulding |
Reception secured, lock single passage system, biometric access control with history |
| Audio and video monitoring |
Internal and external monitoring with historical retention |
| Intrusion detection |
Intrusion detection coverage areas, monitoring access to different levels of containment doors, detection inside and outside the building. |
| Containment |
5 levels |
| Security staff |
On site 24/7 |
| Fire detection |
Detection: “Analogue Point. Total detection of fire throughout the building. |
| Fire protection |
Fire protection compartmentalisation of accommodation rooms, telecom rooms and technical rooms. Fire-proof doors and walls. Hifog system for server rooms. Specific fire extinguishers in all rooms and equipment |
| Flood detection |
Détection sur l’ensemble des réseaux de refroidissement |
| Flood protecton |
Systèmes de drainage et d’évacuation intérieur et extérieur, absence de canalisation au-dessus des salles d’hébergement |
Electrical installations
| Guaranteed power |
10 MVA |
| Compatibility |
Surge protectors, protection against over voltage and residual currents |
| Powr transformation |
Transformer station middle voltage to low voltage on site (5x2500 k/VA transformers, N+1), at a sufficient distance hosting and telecom rooms (electro smog) |
| Power distribution |
Double power grid distribution with seamless switching <10 ms through modules charge transfer (STS). Each rack is connected via rail energy on two separate switchboards (N+N redundancy) |
| UPS Power |
Each branch is protected by dynamic inverters kinetic energy storage (5 Nobreak of 2500 kVAN +1 redundancy). All systems are powered with uninterruptible cooling |
| Power backup |
Each electrical power distribution branch is protected by a diesel generator (5 groups of 2’500 kVA directly related to dynamic, N+1 redundancy), each supplied redundantly fuel (2 main tanks + 5 daily tankers a total of 160;000 liters stored on site, corresponding to 80 hours of power consumption at full load, with additional supply program): |
Installations
| Production |
4 turbo compressors groups of 2500 kW (redundancy N+N), 2 free-cooling exchangers to use external cold air |
| Distribution |
Double distribution network of ice water (redundancy N+N) |
| Air conditioning units |
50 kW per unit for liquid cooling (N+N redundancy), 55 kw per unit for cooling ventilation located outside of the holding rooms (N+1) |
| Electrical power supply |
All power systems production and distribution of cooling and air conditioning units are located behind uninterruptible power supply |
SLA
| Electricity |
99.999% available |
| Temperature |
99.9% (22 °C +- 4 °C) |
| Humidity |
99.9% (48% +- 15%) |